About the project

  • Client: ENI Factory
  • Address: Makueni County, Kenya
Specialised Power Systems Ltd (SPS) successfully supplied and installed the power distribution infrastructure for the ENI Factory in Makueni County, ensuring a stable, efficient, and high-capacity electrical system to support industrial operations.

Scope of Supply & Installation

Low Voltage Switchboards – Custom-engineered LV switchboards designed to handle high-power loads, incorporating withdrawable ACBs, advanced metering, and redundancy features for uninterrupted operation.
11kV Ring Main Unit (RMU) with Bypass System – Provided a fully integrated 11kV RMU, including a bypass system, enabling seamless maintenance and enhanced power reliability.
Two 2500kVA Dry-Type Transformers – Supplied and commissioned 2500kVA dry-type transformers, ensuring efficient power distribution, improved safety, and reduced maintenance needs for the data centre environment.
This project was executed with a strong focus on reliability, scalability, and operational continuity, aligning with Safaricom’s high standards for data security and uptime. The installed power infrastructure supports critical loads with high efficiency, reinforcing Safaricom’s commitment to seamless digital connectivity.

Type a message
Hello 👋

How can I help you?